Process GuideContact an Engineer
Display Rework De-gumming: Cold-soak Essentials
ACF/OCA/lamination rework favors swelling-peel; temperature and soak time determine substrate safety.
1Cold-soak basics
Soak at room temperature: thin adhesive 5-15 min, thick 20-30 min, halved with ultrasonics (HKC-ACF-N). OCA removal 5-15 min at 40°C; polarizer soak beyond 30 min risks TAC damage.
2Protect AF coating
Screen lamination strippers (L556/L715/L716/BLG-1700) are AF-safe by design; wipe pads with alcohol after rework and check for discoloration.
Need technical support or a sample?
Tell us your substrate, contamination and process conditions — our process engineers will recommend a grade and arrange sample validation.
- Phone
- +86 769-82786068
- sales@sempurion.com
- Website
- www.sempurion.com
- Address
- Songshan Lake, Dongguan, Guangdong, China